A Monthly Engineering Goals Checklist for Busy Small Teams

A Monthly Engineering Goals Checklist for Busy Small Teams

Engineering teams are good at tracking tickets and surprisingly bad at tracking the goals behind them. A goal such as “make deployments less painful” gets written during a rough week, then outlives the problem, the pipeline and sometimes the person who wrote it. This post gives you a checklist you can run in half an hour to reread your engineering goals monthly and decide, goal by goal, whether to keep, adjust or drop it. It is deliberately informal. Grab a coffee, open your goals doc and tick along.

Before you start: set the stage

Three small preparations make the session smoother.

  • One document. All team goals live in a single page. If they are scattered across chat threads, collect them first. That tidy-up alone is often worth the effort.
  • One timekeeper. Somebody watches the clock and stops the meeting at the half-hour mark.
  • One scribe. Somebody records each decision and a single line about what changed in the system since last month.

Checklist part one: is the goal still true?

Read each goal aloud and run through these checks.

  1. Is the problem still there? A goal to shorten a slow build step is moot if the step was replaced last week. If the pain is gone, drop the goal and celebrate.
  2. Is the system still the same? Goals name tools, services and environments. If the service was retired or the cloud setup changed, the goal needs rewording at minimum.
  3. Is the owner still around? A goal nobody is responsible for is a wish. Either assign someone or drop it.
  4. Has the business reason changed? Engineering goals rest on reasons such as a customer commitment or a cost concern. If the reason has moved, the goal may have moved with it.

Checklist part two: is the goal still well-formed?

  1. Could a new joiner act on it? “Improve reliability” fails this test. “Add a restart policy to the background workers” passes.
  2. Does it name a finish point? You do not need a deadline, but you do need to know what done looks like.
  3. Is it small enough? If it has been on the list for months without movement, it is probably too big. Split it or shrink it.
  4. Does it conflict with another goal? Two goals competing for the same engineer’s week cannot both be live.

For goals that touch requirements and scoping, a reread is a good moment to compare your wording with a reference such as an engineering blueprint for web project requirements. The reference settles nothing on its own; its value is that it makes fuzzy sentences in your own list stand out.

Checklist part three: decide and write it down

For every goal, choose exactly one of three outcomes.

  • Keep: no change. Leave the wording alone so the history stays clean.
  • Adjust: change the wording, size or owner. Record the old and new versions in the review note.
  • Drop: remove it from the live list and add a one-line reason. The reason matters more than people expect, because without it dropped goals have a habit of returning from the dead.

A concrete example from a pipeline team

Picture a team that started the year with a goal to migrate all services to a new continuous integration setup. At the first monthly reread, two services had moved and the rest were scheduled. The goal was kept. At the third reread, a product decision had retired four of the remaining services. The goal was adjusted: the target list shrank, and the finish point became clearer. At the fifth reread, the migration was done, and the goal was dropped with a note saying so.

Another goal on the same list read “reduce flaky tests”. It was written after a bad week, and by the second reread nobody could name a single flaky test. The team dropped it, and agreed to add it back only if the pain returned. That conversation took two minutes and freed a slot for something with a real owner.

A second example from the on-call side

Consider a goal written after a noisy month: “make the on-call week more humane”. It is a fine sentiment but a poor goal, and a reread shows why. At the first sitting, the team asks which part of the week hurts, and the answer is handoffs between shifts. The goal is adjusted to “write a short handoff note template and use it for every rotation”. At the next sitting, the template exists and is in use, so the goal is kept for one more month to confirm the habit, then dropped as complete.

Notice how the reread did the real work here. It did not add effort; it converted a mood into a task and then retired the task when it was finished. That is the pattern to look for in every goal on your list.

Prepare in five minutes

The meeting goes faster if each person spends a few minutes beforehand reading the list alone and marking their first instinct beside each goal. Instincts are often right, and where they differ the discussion becomes useful quickly. Send the document a day ahead and ask for nothing more than a quick pass.

A note on bringing in outside ideas

Teams sometimes use the reread to ask whether the goals reflect enough outside perspective. Reading how others frame their questions can help, such as an article on a set of questions to ask before commissioning a bespoke web app. Skills goals benefit too: an engineer who wrote “get better at cloud networking” last spring may now need something else entirely. As a general illustration of how learning offers can be organised, the web presence of an aviation-oriented e-learning service, AirCrewU, groups its material into subject areas and describes itself as an independent platform. Whatever field you work in, a monthly reread is where you decide which learning goal still earns your evenings.

What happens to the tickets

A dropped goal usually leaves tickets behind. After the session, scan the backlog for work that only existed to serve a goal you just retired, and close it with a short comment pointing to the decision. Do the opposite for adjusted goals: reword or reorder any ticket whose description still matches the old wording. This tidy-up takes a few minutes and spares the next engineer from wondering why a ticket exists. It also gives the reread teeth, since the decision visibly changes what the team works on.

Common stumbling blocks

  • The reread becomes a status meeting. If people start reporting progress, steer back: the question is fit, not completion.
  • Nobody wants to drop anything. Remind the group that a dropped goal is archived, not deleted.
  • Goals read like tickets. A goal states a direction; a ticket states a task. Keep them separate.
  • The session creeps past thirty minutes. Park the extra debate and schedule a separate conversation.

A printable version

Here is the short form you can paste into your goals doc and reuse each month:

  1. Is the problem still there?
  2. Is the system still the same?
  3. Does the goal have an owner?
  4. Has the business reason moved?
  5. Could a new joiner act on it?
  6. Is it small enough to finish?
  7. Decision recorded: keep, adjust or drop, with a one-line reason.

Wrapping up

Rereading goals will not speed up a pipeline directly. Its job is to keep your effort attached to goals that still make sense, which is where speed actually comes from. Run the checklist this month, note what you dropped, and see whether next month’s planning feels lighter. In most teams, it does.